TERRACE WATERROOFING BY CHEMICAL TREATMENT

 

  • Initial survey & diagnosis of the terrace coba, chajjas, parapet wall by rebound hammer test
  • Marking the debonded areas for patch repair works by polymer treatment or cement insulation plaster
  • Opening the cracks in V groove pattern. Cleaning & Filling the same with sealants
  • Washing the surface with high speed jet water to remove all loose dust ,oil etc
  • Applying first coat of primer depending upon the surface .ie. IPS ,China chips etc
  • Laying the 45/225 gsm fibermesh depending upon the span f the terrace
  • Pouring acrylic/modified bitumen/PU coating on the top of the mesh and spreading with a roller
  • Finally applying two to three coats of elastomeric anti fungus coating of Acrylic/PU with brush/spray

 


 

BASEMENT WATERPROFING

 

  • Initial survey and diagnosis of leakages
  • Detecting sources of leakages and marking of specific leakage points
  • Locating construction joints ,tie bar holes
  • Using metal packers and a high pressure 5000 psi pressure pump to inject PU or Epoxy depending on the volume of leakage.
  • Using high pressure cement grouting pump in raft, pardies etc
  • Cutting and sealing the holes
  • Sealing the construction joints
  • Observation and checking the result

 


 

LIFTPIT WATERPROOFING

 

  • Initial survey and diagnosis of leakages
  • Detecting sources of leakages and marking of specific leakage points
  • Locating construction joints
  • Fixing metal packers in a grid patter at 9” distance ,using high pressure 5000 psi pressure pump to inject PU or Epoxy depending on the volume of leakage.
  • Using high pressure cement grouting pump in raft, pardies etc
  • Cutting and sealing the holes
  • Sealing the construction joints
  • Observation and checking the result
  • Applying crystalline chemical on all the surfaces
  • Laying micro concrete at bottom

 


 

PODIUM/CAR PARKING WATERPROOFING

 

  • Initial survey and diagnosis of leakages
  • Detecting sources of leakages and marking of specific leakage points
  • Locating construction joints and cracks on the slab
  • Filling the cracks with appropriate sealants
  • Checking and attending the expansion joints
  • Using metal packers and a high pressure 5000 psi pressure pump to inject PU or Epoxy depending on the volume of leakage.
  • Using high pressure cement grouting pump in raft, pardies etc
  • Cutting and sealing the holes
  • Sealing the construction joints
  • Observation and checking the result
  • Final if required applying PU coating system

 


 

STOPPING ACTIVE WATER LEAKAGES IN CEILINGS

 

  • Initial survey and diagnosis of leakages
  • Detecting sources of leakages and marking of specific leakage points
  • Using metal packers and a high pressure 5000 psi pressure pump to inject PU or Epoxy depending on the volume of leakage.
  • Cutting and sealing the holes
  • Cutting and sealing the cracks
  • Observation and checking the result
  • Application of crystalline chemical if required